|
|
 |
|
| Significant damage due to ice daming was repaired |

|
| Original plaster, millwork, stairs & the railing were all rebuilt to 1919 craftsmanship levels. |
| Old world plaster techniques were used for repairs |

|
| All original millwork and related items were salvaged even after major ice dam water damage. |

|
| The entire 2nd floor main hall and back stairs were also redone including hardwood floor refinishing |
| Original 1919 study |

|
| The circa 1919 study was rewired to modern standards and then rehabilitated. |
|
 |
|
|
|
Karlovec & Company, 17619 Winslow Road, Shaker Heights, OH 44120
|
|
|
 |